Reduce downtime in production facilities with these 4 tips

Published: 2022-01-27
Written by: Linn Björklund

Share this post with others:

Image

There’s a lot of truth in the expression “what gets measured gets done”. Unless you start tracking the causes of unplanned downtime or breakdowns in your facilities, you won’t know what measures to take to improve availability in the future. Therefore, documentation and traceability are key to reduce downtime. But how do you prioritise these matters in a busy workday? These four tips will help you succeed.

1. Build a continuous improvement culture

Making sure everyone knows what they’re supposed to do is one thing; getting that bevaviour to really stick in the group on a day-to-day basis is a different matter. To succeed requires clear leadership and division of responsibilities. The employees need to understand the purpose – and see the results of – following the established routines and documenting every defect and deviation. Otherwise, lack of motivation (and human error) will lead to negligence, low priority, and important data not being recorded. Again, continuous follow-ups are crucial. They will show the long-term results of performing tasks that might be difficult to see the immediate impact of and allow plant managers to detect if anything has been neglected. Doing the right thing should be easy and rewarding; not doing it needs to have consequences – before it causes another unplanned stoppage.

Find out more in the article How to establish a continuous improvement culture for your facility.

2. Simplify, and digitize frontline reporting

The bigger the facility, the more there is to control and document, which becomes overwhelming if done on paper. More and more companies use digital systems for documenting and following up on stoppages and downtime (caused by acute corrective maintenance or other disruptions), as well as detailed checklists and routines for preventative maintenance tasks. This enables extensive documentation with categorisation, photos, and comments showing the full historic records – without requiring vast resources; neither in time nor storage space. By connecting the control systems of your machines, vehicles, or facilities, you can make sure different routines are activated automatically after a specified production time, mileage, or number of produced units. This makes your maintenance work more accurate than if a routine is carried out at a fixed time interval, regardless of the actual production during the time span.

Image
Best practice
9 keys to maximise the availability of your assets through frontline digitisation

To minimise downtime and maximise availability, you need clear routines and checklists – and your frontline staff to follow them. This guide is packed with best practices on how to leverage digital tools to enable behavioural change.

3. Keep a downtime log

Keep a downtime log that includes all forms of standstills, disruptions, and acute corrective maintenance that cause downtime. Make sure the documentation is as detailed as possible with photos and comments to clearly show what led up to the stoppage, which part of the facility caused it, as well as how long the downtime lasted, and what measures were taken to solve the problem.

By continuously collecting this data, you can start mapping out which types of issues are causing the most disruptions to planned production. That way, you’ll have the facts in place to make well-informed decisions that will reduce unplanned downtime in the future. Examples of measures could be improving routines and processes or calculating the ROI of larger investments needed to eliminate the root cause of recurring stoppages. The documentation in the log also minimises the risk of important information being lost if someone in the team should fall ill or leave the company.

4. Do continuous follow-ups

Documentation is an important first step, but without a proper follow-up, it won’t provide the desired results. Don’t let your documentation collect dust on a shelf somewhere. Identify stoppages where you see a pattern as well as the biggest potential for improvement. Analyse the root causes and set up an action plan to design them out or create additional routines to minimise future breakdowns. Include continuous follow-ups as a regular part of the agenda on weekly or monthly staff meetings. That way, you’ll show staff that these matters are prioritised by the company. It also means important lessons can be learned and shared directly with the entire team.

Share this post with others:

Want to know what CheckProof can do for you?

CheckProof's easy-to-use app makes it easier to do the right thing at the right time. Discover how you can run world-class maintenance that is both cost-effective and sustainable.

Book a demo
Featured image for “CMMS Features and Functionality: What to Look for in a Maintenance Management System”
2026-04-24
CMMS Features and Functionality: What to Look for in a Maintenance Management System
Not all CMMS (Computerized Maintenance Management System) platforms are built the same, and in industries like quarrying, aggregates, cement, and ready-mix concrete, there are certain capabilities that carry more weight than others. The CMMS features that matter most for maintenance teams in asset-intensive industries include things such as centralized asset data, work order automation, preventive and predictive scheduling, digital checklists, deviation management, fleet optimization, and mobile-first design with offline capability.
Featured image for “Cement Plant Inspection Checklist: What to Check, When to Check It, and Why It Fails”
2026-04-24
Cement Plant Inspection Checklist: What to Check, When to Check It, and Why It Fails
Most unplanned shutdowns in a cement plant don’t come out of nowhere. There’s usually a trail beforehand. Maybe a kiln bearing that’s been running 15 degrees above baseline for three weeks, noted by the operator on shift but never formally flagged because it hadn’t tripped an alarm yet. The issue isn’t a lack of warning, its that small deviations are often tolerated until they tip over into something serious.
Featured image for “How to Choose the Right Work Order App for Your Industry”
2026-04-01
How to Choose the Right Work Order App for Your Industry
When something breaks on site, the fix gets most of the attention, but it’s rarely where things go wrong. What’s just as critical is everything around it: who reported it, who picked it up, what got missed between shifts, and how long it sat before anyone acted. In many operations, that whole flow is still held together by paper forms, radio calls, and memory.
Featured image for “Best Practices for Work Order Management”
2026-04-01
Best Practices for Work Order Management
Efficient maintenance starts with clear work orders. When issues are logged quickly with the right details, photos, and priority, teams spend less time chasing information and more time fixing problems. The result is reduced downtime, smoother shift handovers, and audit-ready operations — even in low-signal or harsh environments where mobile work orders let crews flag issues before they escalate.
Featured image for “How DAY Group went paperless and transformed maintenance operations with CheckProof”
2026-03-26
How DAY Group went paperless and transformed maintenance operations with CheckProof
DAY Group Ltd is an independent, family-owned business supplying construction materials and services across the south of England since 1947. Handling over five million tonnes of material annually across divisions including Day Aggregates, Day Glass Recycling, Day Contracting, and Day Equestrian — plus recycling operations processing over 1.5 million tonnes a year — the group operates with close to 200 staff and a large fleet of plant equipment, making uptime, compliance and safety mission-critical.
Featured image for “CONEXPO-CON/AGG 2026 – CheckProof’s Industry Report”
2026-03-17
CONEXPO-CON/AGG 2026 – CheckProof’s Industry Report
CONEXPO-CON/AGG 2026 highlighted an industry laser-focused on execution: demand is strong, but labor, schedules, and downtime risk remain tight. The goal is clear — repeatable performance, early risk visibility, and simpler tech adoption. This report covers the key signals from the show and what they mean for the next era of construction materials.
Featured image for “Gebr. Arweiler: Transforming Multi-Site Maintenance with one Digital System”
2026-02-20
Gebr. Arweiler: Transforming Multi-Site Maintenance with one Digital System
Gebr. Arweiler, a family-owned company with multiple locations across Saarland and France, has long been known for combining tradition with forward-looking action. With eight plants, a fleet of 26 trucks – including 5 electric vehicles – and a strong commitment to sustainability, the company needed a digital solution to optimize maintenance, asset management, and compliance.
Featured image for “Predictive Maintenance vs Condition-Based Maintenance”
2026-02-12
Predictive Maintenance vs Condition-Based Maintenance
Walk any quarry, plant, or yard and you’ll see the same thing: assets and equipment emitting tell-tale signs of its condition, long before it actually fails. Operators note “sounds off” on a pre-shift, but the note gets buried in a binder or a spreadsheet. The gap between seeing a problem and acting on it at the right time is often where maintenance strategies break down.
Featured image for “Fault Tree Analysis 101 – A Comprehensive Guide”
2026-02-06
Fault Tree Analysis 101 – A Comprehensive Guide
Equipment rarely fails for a single reason. Fault Tree Analysis (FTA) helps teams work backwards from a breakdown, separate symptoms from causes, and identify what needs to change to prevent repeat failures.
Featured image for “Holcim’s Torr Works Super Quarry – a Customer Success Story”
2026-01-30
Holcim’s Torr Works Super Quarry – a Customer Success Story
On a quarry as large and complex as Holcim’s Torr Works, staying on top of daily work is a constant challenge. When information is scattered across paper, radios, and emails, even small issues can take too long to act on. This customer story looks at how Torr Works brought everything into one connected system with CheckProof – and what happened when visibility and ownership became part of everyday site work.